Case Studies

Named projects. Named directors. Documented outcomes.

Storm Reinstatement — St Peter

Storm Damage to Granite Cottage. Full project management of repairs.

Fallen Tree

Peril

Structural

Damage

Full Reinstatement

Outcome

A mature tree fell onto a traditional Jersey granite cottage during a storm. The impact caused structural failure to the gable wall and roof. The policyholder instructed Peak Surveying to act independently of the insurer.

Mike McGrath conducted the initial damage inspection and prepared stabilisation specifications. The property was made safe, then assessed for full reinstatement.

Peak Surveying advised and procured third party structural engineers and planning consultants. Planning and building bye-law approvals were obtained. Competitive tender documentation was prepared and a contractor appointed.

McGrath administered the reinstatement contract from commencement through to practical completion. The property was fully reinstated to its original specification.

Fallen tree on cottage — before

Before — fallen tree on the granite cottage

Cottage stabilised — during works

During — stabilised and protected

Reinstated granite cottage — after

After — fully reinstated

Fire Reinstatement — St Brelade

Kitchen fire. Full structural reinstatement specified and administered.

Kitchen Fire

Peril

Structural & Fire

Damage

Full Reinstatement

Outcome

A residential kitchen fire in St Brelade caused structural damage to the roof and interior. The policyholder appointed Peak Surveying to manage the reinstatement independently.

Detailed damage assessment and technical specifications for strip-out and enabling works. Coordination of specialist contractors. Planning and building bye-law approvals obtained.

Advised and procured third party structural engineers and planning consultants. Competitive tender documentation prepared. Full contract administration and site management through to completion.

Fire-damaged roof structure — St Brelade
Fire-damaged interior — ceiling and room destruction

Interior damage assessment — St Brelade

Dilapidations — St Helier

£166,000 saved. A £253,000 dilapidations claim settled at £87,000.

4,000 sq ft

Office suite

£253,000

Claim served

£87,000

Settlement

A commercial tenant in St Helier's financial district was served a terminal schedule of dilapidations. The landlord's surveyor valued the claim at £253,000. The tenant instructed Peak Surveying two months before lease termination.

McGrath and McInnes conducted a lease analysis and visual survey. Discrepancies between the schedule and the lease obligations were identified. Direct surveyor-to-surveyor negotiation followed.

The claim was settled at £87,000. Peak Surveying operated independently throughout. No insurer instruction was accepted.