Case Studies
Named projects. Named directors. Documented outcomes.
Storm Reinstatement — St Peter
A fallen tree, a Jersey stone cottage, a structural assessment. The property is reinstated.
Fallen Tree
Peril
Structural
Damage
Full Reinstatement
Outcome
A mature tree fell onto a traditional Jersey granite cottage during a storm. The impact caused structural failure to the gable wall and roof. The policyholder instructed Peak Surveying to act independently of the insurer.
Mike McGrath conducted the initial damage inspection and prepared stabilisation specifications. The property was made safe, then assessed for full reinstatement.
Peak Surveying coordinated architects and structural engineers. Planning and building bye-law approvals were obtained. Competitive tender documentation was prepared and a contractor appointed.
McGrath administered the reinstatement contract from commencement through to practical completion. The property was fully reinstated to its original specification.



Fire Reinstatement — St Brelade
Kitchen fire. Full structural reinstatement specified and administered.
Kitchen Fire
Peril
Structural & Fire
Damage
Full Reinstatement
Outcome
A residential kitchen fire in St Brelade caused structural damage to the roof and interior. The policyholder appointed Peak Surveying to manage the reinstatement independently.
Detailed damage assessment and technical specifications for strip-out and enabling works. Coordination of specialist contractors. Planning and building bye-law approvals obtained.
Structural engineering design commissioned. Competitive tender documentation prepared. Full contract administration and site management through to completion.


Dilapidations — St Helier
£166,000 saved. A £253,000 dilapidations claim settled at £87,000.
4,000 sq ft
Office suite
£253,000
Claim served
£87,000
Settlement
A commercial tenant in St Helier’s financial district was served a terminal schedule of dilapidations. The landlord’s surveyor valued the claim at £253,000. The tenant instructed Peak Surveying two months before lease termination.
McGrath and McInnes conducted a lease analysis and visual survey. Discrepancies between the schedule and the lease obligations were identified. Direct surveyor-to-surveyor negotiation followed.
The claim was settled at £87,000. Peak Surveying operated independently throughout. No insurer instruction was accepted.
Defect Diagnosis & Maintenance
[Case study title — awaiting client content]
[This case study is awaiting narrative and photographs from the client. Placeholder content only.]
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris.
Contact
Discuss your claim.
Speak with McGrath or McInnes directly. No assessment charge. No obligation.
